{"id":6907,"date":"2023-03-28T12:07:51","date_gmt":"2023-03-28T12:07:51","guid":{"rendered":"https:\/\/www.execujet-mro.com\/?p=6907"},"modified":"2023-03-28T12:15:23","modified_gmt":"2023-03-28T12:15:23","slug":"execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction","status":"publish","type":"post","link":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","title":{"rendered":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction"},"content":{"rendered":"<p>ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons.<\/p>\n<p>\u201cThe installation of these columns is an important milestone. These two columns are the first structural part of the hangar to be installed and are there to support the weight of the hangar roof,\u201d says Ivan Lim, Regional VP Asia for ExecuJet MRO Services.<\/p>\n<p>\u201cConstruction is progressing as planned, and we look forward to opening the facility in early 2024\u201d, says Lim.<\/p>\n<p>In the first phase of construction, foundation works including piles and pile-caps that prepare the site for the superstructure were laid, completing the groundwork after which the two steel columns were installed.<\/p>\n<p>ExecuJet MRO Services is the largest business aviation MRO in Malaysia and its decision to move into a new, larger purpose-built facility will further reinforce Malaysia\u2019s position as a center for MRO in the region.<\/p>\n<p>Lim adds: \u201cWe have grown tremendously over the years with the support of our customers all over the region. As Southeast Asia\u2019s business aviation market continues to grow, it merits a large investment in MRO capacity and expertise.\u201d<\/p>\n<p>The new facility will have a gross floor area of approximately 149,500 sq. ft. The hangar will be able to accommodate approximately 10-15 business jets of various sizes simultaneously, such as the ultra-large Dassault Falcon 10X. The facility will be replete with corporate offices, customer lounge areas, dedicated apron area, and back shops.<\/p>\n<p>Lastly, the new hangar will also have environmentally friendly features, such as use of solar power, energy-efficient LED lights and rainwater-harvesting water tanks, as part of the Group\u2019s ongoing Corporate Social Responsibility commitment.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important&hellip; <br \/> <a class=\"button small blue\" href=\"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/\">Read more<\/a><\/p>","protected":false},"author":3,"featured_media":6908,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-6907","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Madie Werner\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"zh_CN\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ExecuJet MRO Services -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services\" \/>\n\t\t<meta property=\"og:description\" content=\"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"556\" \/>\n\t\t<meta property=\"og:image:height\" content=\"189\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-03-28T12:07:51+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-03-28T12:15:23+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services\" \/>\n\t\t<meta name=\"twitter:description\" content=\"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#blogposting\",\"name\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services\",\"headline\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction\",\"author\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"Picture shows one of the steel columns that will hold up the hangar roof and in background there is the second column\"},\"datePublished\":\"2023-03-28T12:07:51+00:00\",\"dateModified\":\"2023-03-28T12:15:23+00:00\",\"inLanguage\":\"zh-CN\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#webpage\"},\"articleSection\":\"Blog\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/blog\\\/#listItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/blog\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#listItem\",\"name\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#listItem\",\"position\":3,\"name\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#organization\",\"name\":\"ExecuJet MRO Services\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-EJ_MRO-White-Logo_2022.png\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#organizationLogo\",\"width\":556,\"height\":189},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/\",\"name\":\"Madie Werner\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Madie Werner\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#webpage\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/\",\"name\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services\",\"description\":\"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \\u201cThe installation of these columns is an important\",\"inLanguage\":\"zh-CN\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#mainImage\",\"width\":2560,\"height\":1920,\"caption\":\"Picture shows one of the steel columns that will hold up the hangar roof and in background there is the second column\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#mainImage\"},\"datePublished\":\"2023-03-28T12:07:51+00:00\",\"dateModified\":\"2023-03-28T12:15:23+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#website\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/\",\"name\":\"ExecuJet MRO Services\",\"inLanguage\":\"zh-CN\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","description":"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important","canonical_url":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#blogposting","name":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","headline":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction","author":{"@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author"},"publisher":{"@id":"https:\/\/www.execujet-mro.com\/zh\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","width":2560,"height":1920,"caption":"Picture shows one of the steel columns that will hold up the hangar roof and in background there is the second column"},"datePublished":"2023-03-28T12:07:51+00:00","dateModified":"2023-03-28T12:15:23+00:00","inLanguage":"zh-CN","mainEntityOfPage":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#webpage"},"isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#webpage"},"articleSection":"Blog"},{"@type":"BreadcrumbList","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/#listItem","position":1,"name":"Home","item":"https:\/\/www.execujet-mro.com\/zh\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/category\/blog\/#listItem","name":"Blog"}},{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/category\/blog\/#listItem","position":2,"name":"Blog","item":"https:\/\/www.execujet-mro.com\/zh\/category\/blog\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#listItem","name":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#listItem","position":3,"name":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction","previousItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/category\/blog\/#listItem","name":"Blog"}}]},{"@type":"Organization","@id":"https:\/\/www.execujet-mro.com\/zh\/#organization","name":"ExecuJet MRO Services","url":"https:\/\/www.execujet-mro.com\/zh\/","logo":{"@type":"ImageObject","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#organizationLogo","width":556,"height":189},"image":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author","url":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/","name":"Madie Werner","image":{"@type":"ImageObject","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","width":96,"height":96,"caption":"Madie Werner"}},{"@type":"WebPage","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#webpage","url":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","name":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","description":"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important","inLanguage":"zh-CN","isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/zh\/#website"},"breadcrumb":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#breadcrumblist"},"author":{"@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author"},"creator":{"@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#mainImage","width":2560,"height":1920,"caption":"Picture shows one of the steel columns that will hold up the hangar roof and in background there is the second column"},"primaryImageOfPage":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#mainImage"},"datePublished":"2023-03-28T12:07:51+00:00","dateModified":"2023-03-28T12:15:23+00:00"},{"@type":"WebSite","@id":"https:\/\/www.execujet-mro.com\/zh\/#website","url":"https:\/\/www.execujet-mro.com\/zh\/","name":"ExecuJet MRO Services","inLanguage":"zh-CN","publisher":{"@id":"https:\/\/www.execujet-mro.com\/zh\/#organization"}}]},"og:locale":"zh_CN","og:site_name":"ExecuJet MRO Services -","og:type":"article","og:title":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","og:description":"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important","og:url":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","og:image":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png","og:image:secure_url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png","og:image:width":556,"og:image:height":189,"article:published_time":"2023-03-28T12:07:51+00:00","article:modified_time":"2023-03-28T12:15:23+00:00","twitter:card":"summary_large_image","twitter:title":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","twitter:description":"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important","twitter:image":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png"},"aioseo_meta_data":{"post_id":"6907","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-10-03 17:45:20","updated":"2025-06-04 10:22:09","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.execujet-mro.com\/zh\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.execujet-mro.com\/zh\/category\/blog\/\" title=\"Blog\">Blog<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.execujet-mro.com\/zh\/"},{"label":"Blog","link":"https:\/\/www.execujet-mro.com\/zh\/category\/blog\/"},{"label":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction","link":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services\" \/>\n<meta property=\"og:description\" content=\"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important&hellip; Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"ExecuJet MRO Services\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-28T12:07:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-28T12:15:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Madie Werner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"Madie Werner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/\"},\"author\":{\"name\":\"Madie Werner\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/person\\\/ac60f4e6ad0992565303c507c705a3c8\"},\"headline\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction\",\"datePublished\":\"2023-03-28T12:07:51+00:00\",\"dateModified\":\"2023-03-28T12:15:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/\"},\"wordCount\":315,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/\",\"name\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\",\"datePublished\":\"2023-03-28T12:07:51+00:00\",\"dateModified\":\"2023-03-28T12:15:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"Picture shows one of the steel columns that will hold up the hangar roof and in background there is the second column\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2023\\\/03\\\/28\\\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.execujet-mro.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#website\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/\",\"name\":\"ExecuJet MRO Services\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.execujet-mro.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#organization\",\"name\":\"ExecuJet MRO Services\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/ExecuJet-MRO-Services-Logo_sml.jpg\",\"contentUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/ExecuJet-MRO-Services-Logo_sml.jpg\",\"width\":676,\"height\":489,\"caption\":\"ExecuJet MRO Services\"},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/person\\\/ac60f4e6ad0992565303c507c705a3c8\",\"name\":\"Madie Werner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"caption\":\"Madie Werner\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","og_locale":"zh_CN","og_type":"article","og_title":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","og_description":"ExecuJet MRO Services Malaysia has achieved a new milestone with the installation of the two central columns for its new purpose-built maintenance, repair and overhaul (MRO) center at Malaysia\u2019s Subang Airport. Each column is made of forged steel and is 12 meters long and weighs 45 tons. \u201cThe installation of these columns is an important&hellip; Read more","og_url":"https:\/\/www.execujet-mro.com\/zh\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","og_site_name":"ExecuJet MRO Services","article_published_time":"2023-03-28T12:07:51+00:00","article_modified_time":"2023-03-28T12:15:23+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","type":"image\/jpeg"}],"author":"Madie Werner","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"Madie Werner","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"2 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#article","isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/"},"author":{"name":"Madie Werner","@id":"https:\/\/www.execujet-mro.com\/#\/schema\/person\/ac60f4e6ad0992565303c507c705a3c8"},"headline":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction","datePublished":"2023-03-28T12:07:51+00:00","dateModified":"2023-03-28T12:15:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/"},"wordCount":315,"commentCount":0,"publisher":{"@id":"https:\/\/www.execujet-mro.com\/#organization"},"image":{"@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","articleSection":["Blog"],"inLanguage":"zh-CN","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","url":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/","name":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction - ExecuJet MRO Services","isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#primaryimage"},"image":{"@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","datePublished":"2023-03-28T12:07:51+00:00","dateModified":"2023-03-28T12:15:23+00:00","breadcrumb":{"@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#primaryimage","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","contentUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2023\/03\/Picture-shows-one-of-the-steel-columns-that-will-hold-up-the-hangar-roof-and-in-background-there-is-the-second-column-scaled.jpg","width":2560,"height":1920,"caption":"Picture shows one of the steel columns that will hold up the hangar roof and in background there is the second column"},{"@type":"BreadcrumbList","@id":"https:\/\/www.execujet-mro.com\/2023\/03\/28\/execujet-mro-services-malaysia-installs-main-structural-columns-for-its-new-hangar-under-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.execujet-mro.com\/"},{"@type":"ListItem","position":2,"name":"ExecuJet MRO Services Malaysia Installs Main Structural Columns for its New Hangar Under Construction"}]},{"@type":"WebSite","@id":"https:\/\/www.execujet-mro.com\/#website","url":"https:\/\/www.execujet-mro.com\/","name":"ExecuJet MRO Services","description":"","publisher":{"@id":"https:\/\/www.execujet-mro.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.execujet-mro.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/www.execujet-mro.com\/#organization","name":"ExecuJet MRO Services","url":"https:\/\/www.execujet-mro.com\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/www.execujet-mro.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2019\/02\/ExecuJet-MRO-Services-Logo_sml.jpg","contentUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2019\/02\/ExecuJet-MRO-Services-Logo_sml.jpg","width":676,"height":489,"caption":"ExecuJet MRO Services"},"image":{"@id":"https:\/\/www.execujet-mro.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.execujet-mro.com\/#\/schema\/person\/ac60f4e6ad0992565303c507c705a3c8","name":"\u9ea6\u8482\u00b7\u6c83\u7eb3","image":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","caption":"Madie Werner"}}]}},"_links":{"self":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/posts\/6907","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/comments?post=6907"}],"version-history":[{"count":0,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/posts\/6907\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/media\/6908"}],"wp:attachment":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/media?parent=6907"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/categories?post=6907"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/tags?post=6907"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}