{"id":4471,"date":"2020-09-16T13:15:24","date_gmt":"2020-09-16T13:15:24","guid":{"rendered":"https:\/\/www.execujet-mro.com\/?p=4471"},"modified":"2020-09-17T13:19:28","modified_gmt":"2020-09-17T13:19:28","slug":"execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft","status":"publish","type":"post","link":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","title":{"rendered":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft"},"content":{"rendered":"<p>SYDNEY (16 September 2020) &#8211; ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express.<\/p>\n<p>The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be dismantled and removed. The external panels, to enclosed structural areas, also need to be removed.<\/p>\n<p>In addition, the 8C check includes performing functional checks on all the operating systems, such as the flight controls, and overhauling the landing gear.<\/p>\n<p>During the project ExecuJet also completed many recommended service bulletins and upgrades offered by Bombardier. \u00a0Incorporating these during the 8C inspection greatly enhances the aircraft\u2019s asset value and reduces downtime later on.<\/p>\n<p>All the work was carried out at ExecuJet\u2019s maintenance, repair and overhaul facility at Sydney Airport. ExecuJet MRO Services Australia was chosen, because of its many years of experience with the Global series aircraft. \u00a0The operator, Walker Air Services Pty Ltd, was also able to closely oversee the work in progress.<\/p>\n<p>Grant Ingall, Vice President Australasia says: \u201cOur capabilities to perform the 10-year inspection have been built up over many years of performing heavy maintenance. ExecuJet MRO Services Australasia is a Bombardier Authorised Service Centre. We have made significant investments in Bombardier tooling and factory training our licensed engineers on the Global series of aircraft.<\/p>\n<p>\u201cWe have been supporting Global Express series aircraft in the region since it was first introduced 20 years ago,\u201d he adds. The 8C heavy maintenance check is the largest scheduled maintenance check for Global Express.<\/p>\n<p>ExecuJet predicts that more operators will choose to have 8C maintenance checks carried out in Australia, thanks to the company\u2019s strong track record and reputation in the market.<\/p>\n<p>Ingall says: \u201cIn previous years, there was a tendency for operators to perform these checks in Europe and the US, but local operators do value our service \u2018day in and day out\u2019. They have confidence in our technical capabilities to deliver a quality service, on-time and cost effectively.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>SYDNEY (16 September 2020) &#8211; ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be&hellip; <br \/> <a class=\"button small blue\" href=\"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/\">Read more<\/a><\/p>","protected":false},"author":3,"featured_media":4472,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-4471","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-release"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Madie Werner\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"zh_CN\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ExecuJet MRO Services -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services\" \/>\n\t\t<meta property=\"og:description\" content=\"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"556\" \/>\n\t\t<meta property=\"og:image:height\" content=\"189\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-09-16T13:15:24+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2020-09-17T13:19:28+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services\" \/>\n\t\t<meta name=\"twitter:description\" content=\"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#blogposting\",\"name\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services\",\"headline\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft\",\"author\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg\",\"width\":2400,\"height\":1600,\"caption\":\"8C Inspection\"},\"datePublished\":\"2020-09-16T13:15:24+00:00\",\"dateModified\":\"2020-09-17T13:19:28+00:00\",\"inLanguage\":\"zh-CN\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#webpage\"},\"articleSection\":\"Press Release\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/press-release\\\/#listItem\",\"name\":\"Press Release\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/press-release\\\/#listItem\",\"position\":2,\"name\":\"Press Release\",\"item\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/press-release\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#listItem\",\"name\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#listItem\",\"position\":3,\"name\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/category\\\/press-release\\\/#listItem\",\"name\":\"Press Release\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#organization\",\"name\":\"ExecuJet MRO Services\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-EJ_MRO-White-Logo_2022.png\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#organizationLogo\",\"width\":556,\"height\":189},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/\",\"name\":\"Madie Werner\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Madie Werner\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#webpage\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/\",\"name\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services\",\"description\":\"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be\",\"inLanguage\":\"zh-CN\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/author\\\/madie-wernerexecujet-eu\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#mainImage\",\"width\":2400,\"height\":1600,\"caption\":\"8C Inspection\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#mainImage\"},\"datePublished\":\"2020-09-16T13:15:24+00:00\",\"dateModified\":\"2020-09-17T13:19:28+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#website\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/\",\"name\":\"ExecuJet MRO Services\",\"inLanguage\":\"zh-CN\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/zh\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","description":"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be","canonical_url":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#blogposting","name":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","headline":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft","author":{"@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author"},"publisher":{"@id":"https:\/\/www.execujet-mro.com\/zh\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg","width":2400,"height":1600,"caption":"8C Inspection"},"datePublished":"2020-09-16T13:15:24+00:00","dateModified":"2020-09-17T13:19:28+00:00","inLanguage":"zh-CN","mainEntityOfPage":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#webpage"},"isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#webpage"},"articleSection":"Press Release"},{"@type":"BreadcrumbList","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/#listItem","position":1,"name":"Home","item":"https:\/\/www.execujet-mro.com\/zh\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/category\/press-release\/#listItem","name":"Press Release"}},{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/category\/press-release\/#listItem","position":2,"name":"Press Release","item":"https:\/\/www.execujet-mro.com\/zh\/category\/press-release\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#listItem","name":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#listItem","position":3,"name":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft","previousItem":{"@type":"ListItem","@id":"https:\/\/www.execujet-mro.com\/zh\/category\/press-release\/#listItem","name":"Press Release"}}]},{"@type":"Organization","@id":"https:\/\/www.execujet-mro.com\/zh\/#organization","name":"ExecuJet MRO Services","url":"https:\/\/www.execujet-mro.com\/zh\/","logo":{"@type":"ImageObject","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#organizationLogo","width":556,"height":189},"image":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author","url":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/","name":"Madie Werner","image":{"@type":"ImageObject","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","width":96,"height":96,"caption":"Madie Werner"}},{"@type":"WebPage","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#webpage","url":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","name":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","description":"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be","inLanguage":"zh-CN","isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/zh\/#website"},"breadcrumb":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#breadcrumblist"},"author":{"@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author"},"creator":{"@id":"https:\/\/www.execujet-mro.com\/zh\/author\/madie-wernerexecujet-eu\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg","@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#mainImage","width":2400,"height":1600,"caption":"8C Inspection"},"primaryImageOfPage":{"@id":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#mainImage"},"datePublished":"2020-09-16T13:15:24+00:00","dateModified":"2020-09-17T13:19:28+00:00"},{"@type":"WebSite","@id":"https:\/\/www.execujet-mro.com\/zh\/#website","url":"https:\/\/www.execujet-mro.com\/zh\/","name":"ExecuJet MRO Services","inLanguage":"zh-CN","publisher":{"@id":"https:\/\/www.execujet-mro.com\/zh\/#organization"}}]},"og:locale":"zh_CN","og:site_name":"ExecuJet MRO Services -","og:type":"article","og:title":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","og:description":"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be","og:url":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","og:image":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png","og:image:secure_url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png","og:image:width":556,"og:image:height":189,"article:published_time":"2020-09-16T13:15:24+00:00","article:modified_time":"2020-09-17T13:19:28+00:00","twitter:card":"summary_large_image","twitter:title":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","twitter:description":"SYDNEY (16 September 2020) - ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be","twitter:image":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2022\/05\/cropped-EJ_MRO-White-Logo_2022.png"},"aioseo_meta_data":{"post_id":"4471","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-10-03 17:37:33","updated":"2025-06-04 10:19:26","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.execujet-mro.com\/zh\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.execujet-mro.com\/zh\/category\/press-release\/\" title=\"Press Release\">Press Release<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.execujet-mro.com\/zh\/"},{"label":"Press Release","link":"https:\/\/www.execujet-mro.com\/zh\/category\/press-release\/"},{"label":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft","link":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services\" \/>\n<meta property=\"og:description\" content=\"SYDNEY (16 September 2020) &#8211; ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be&hellip; Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/\" \/>\n<meta property=\"og:site_name\" content=\"ExecuJet MRO Services\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-16T13:15:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-17T13:19:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW-1024x683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Madie Werner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"Madie Werner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/\"},\"author\":{\"name\":\"Madie Werner\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/person\\\/ac60f4e6ad0992565303c507c705a3c8\"},\"headline\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft\",\"datePublished\":\"2020-09-16T13:15:24+00:00\",\"dateModified\":\"2020-09-17T13:19:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/\"},\"wordCount\":356,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg\",\"articleSection\":[\"Press Release\"],\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/\",\"name\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg\",\"datePublished\":\"2020-09-16T13:15:24+00:00\",\"dateModified\":\"2020-09-17T13:19:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg\",\"contentUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg\",\"width\":2400,\"height\":1600,\"caption\":\"8C Inspection\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/2020\\\/09\\\/16\\\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.execujet-mro.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#website\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/\",\"name\":\"ExecuJet MRO Services\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.execujet-mro.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#organization\",\"name\":\"ExecuJet MRO Services\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/ExecuJet-MRO-Services-Logo_sml.jpg\",\"contentUrl\":\"https:\\\/\\\/www.execujet-mro.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/ExecuJet-MRO-Services-Logo_sml.jpg\",\"width\":676,\"height\":489,\"caption\":\"ExecuJet MRO Services\"},\"image\":{\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.execujet-mro.com\\\/#\\\/schema\\\/person\\\/ac60f4e6ad0992565303c507c705a3c8\",\"name\":\"Madie Werner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g\",\"caption\":\"Madie Werner\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","og_locale":"zh_CN","og_type":"article","og_title":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","og_description":"SYDNEY (16 September 2020) &#8211; ExecuJet MRO Services Australia has completed the first 120 Month (8C) heavy maintenance check performed in Australia on a Bombardier Global Express. The 8C heavy maintenance check involves a large scope of work, including many structural inspections. To inspect the airframe and other structures, the interior cabin needs to be&hellip; Read more","og_url":"https:\/\/www.execujet-mro.com\/zh\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","og_site_name":"ExecuJet MRO Services","article_published_time":"2020-09-16T13:15:24+00:00","article_modified_time":"2020-09-17T13:19:28+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW-1024x683.jpg","type":"image\/jpeg"}],"author":"Madie Werner","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"Madie Werner","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"2 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#article","isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/"},"author":{"name":"Madie Werner","@id":"https:\/\/www.execujet-mro.com\/#\/schema\/person\/ac60f4e6ad0992565303c507c705a3c8"},"headline":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft","datePublished":"2020-09-16T13:15:24+00:00","dateModified":"2020-09-17T13:19:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/"},"wordCount":356,"commentCount":0,"publisher":{"@id":"https:\/\/www.execujet-mro.com\/#organization"},"image":{"@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#primaryimage"},"thumbnailUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg","articleSection":["Press Release"],"inLanguage":"zh-CN","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","url":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/","name":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft - ExecuJet MRO Services","isPartOf":{"@id":"https:\/\/www.execujet-mro.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#primaryimage"},"image":{"@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#primaryimage"},"thumbnailUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg","datePublished":"2020-09-16T13:15:24+00:00","dateModified":"2020-09-17T13:19:28+00:00","breadcrumb":{"@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#primaryimage","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg","contentUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2020\/09\/2020-09-16-ExecuJet-MRO-Services-Australia-Completes-First-8C-Inspection-on-Global-Aircraft_VH-LAW.jpg","width":2400,"height":1600,"caption":"8C Inspection"},{"@type":"BreadcrumbList","@id":"https:\/\/www.execujet-mro.com\/2020\/09\/16\/execujet-mro-services-completes-first-120-month-8c-inspection-in-australia-on-bombardier-global-express-aircraft\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.execujet-mro.com\/"},{"@type":"ListItem","position":2,"name":"ExecuJet MRO Services Completes First 120 Month (8C) Inspection in Australia on Bombardier Global Express Aircraft"}]},{"@type":"WebSite","@id":"https:\/\/www.execujet-mro.com\/#website","url":"https:\/\/www.execujet-mro.com\/","name":"ExecuJet MRO Services","description":"","publisher":{"@id":"https:\/\/www.execujet-mro.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.execujet-mro.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/www.execujet-mro.com\/#organization","name":"ExecuJet MRO Services","url":"https:\/\/www.execujet-mro.com\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/www.execujet-mro.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2019\/02\/ExecuJet-MRO-Services-Logo_sml.jpg","contentUrl":"https:\/\/www.execujet-mro.com\/wp-content\/uploads\/2019\/02\/ExecuJet-MRO-Services-Logo_sml.jpg","width":676,"height":489,"caption":"ExecuJet MRO Services"},"image":{"@id":"https:\/\/www.execujet-mro.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.execujet-mro.com\/#\/schema\/person\/ac60f4e6ad0992565303c507c705a3c8","name":"\u9ea6\u8482\u00b7\u6c83\u7eb3","image":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0be090a53c3c3c1931d65c43826dffe6272ce8945ac2cc470295b3e2390aa6e4?s=96&d=mm&r=g","caption":"Madie Werner"}}]}},"_links":{"self":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/posts\/4471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/comments?post=4471"}],"version-history":[{"count":0,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/posts\/4471\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/media\/4472"}],"wp:attachment":[{"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/media?parent=4471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/categories?post=4471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.execujet-mro.com\/zh\/wp-json\/wp\/v2\/tags?post=4471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}